Руководство Пользователя для American Megatrends 1100-p
Rail Screws (in the bag labeled “Rail”)
Screw Qty
Description
4
Flat head M4 x 4 mm [0.157]. Used to secure the Rear Inner Chassis
Rails to the 1100 Chassis.
Rails to the 1100 Chassis.
12
Round head M4 x 4 mm [0.157]. Used primarily to secure the Rack
Rail front brackets to the Rack Rails. You only need a total of 4.
Rail front brackets to the Rack Rails. You only need a total of 4.
8
Flat head M5 x 12 mm [0.472]. Used in conjunction with the
supplied Washer to secure the Rack Rails to your Rack Enclosure.
supplied Washer to secure the Rack Rails to your Rack Enclosure.
8
Washer for M5. Use with the Flat head M5 screw when you secure
the Rack Rails to your Rack Enclosure.
the Rack Rails to your Rack Enclosure.
Choosing a Setup Location
• Leave enough clearance in front of the rack to enable you to open the front door
completely (~25 inches).
• Leave approximately 30 inches of clearance in the back of the rack to allow for
sufficient airflow and ease in servicing.
Warning
Rack Precautions
• Ensure that the leveling jacks on the bottom of the rack are fully extended to the
floor with the full weight of the rack resting on them.
• In a single rack installation, stabilizers should be attached to the rack.
• In multiple rack installations, the racks should be coupled together.
• Always make sure the rack is stable before extending a component from the rack.
• You should extend only one component at a time - extending two or more
simultaneously may cause the rack to become unstable.
Server Precautions
• Review the General Safety Precautions.
• Determine the placement of each component in the rack before you install the
rails.
• Install the heaviest server components on the bottom of the rack first, and then
work up.
• Use a regulating uninterruptible power supply (UPS) to protect the server from
power surges, voltage spikes and to keep your system operating in case of a
power failure.
power failure.
• Allow the power supply units and hot plug Serial ATA drive to cool before
touching them.
• Always keep the rack's front door and all panels and components on the servers
closed when not servicing to maintain proper cooling.
StorTrends® 1100 User’s Guide
8