Preparing for Installation
Moving the Library
The following requirements are necessary to protect all library and components 
crates as they are maneuvered from storage to their operating location.
Caution:
All library and components should be kept crated while moving 
them to the data center. If the data center is not able to 
accommodate the crates, contact Spectra Logic Professional 
Services.
Clearance
Before moving the library and components to where they will be installed, make 
sure that you have access to necessary doorways, stairways, hallways, and elevators, 
as well as adequate clearance to move through them.
Doorways (including thresholds) must be taller than 80 inches (203.2 cm) and 
wider than 48 inches (122 cm).
Stairwells must be taller than 90 inches (229 cm) and wider than 48 inches 
(122 cm).
Stairway and hallway corners should be wider than 67 inches (170 cm).
Elevators and elevator doors should be taller than 90 inches (229 cm) and wider 
than 48 inches (122 cm).
Elevators should be able to transport at least 1,091 lbs. (495 kg).
Tilting
The Spectra T950 library should not be tilted as it is moved.
Caution:
If you tilt the library, Spectra Logic is not responsible for any 
damage caused to the library or its components, or for any 
damage caused to your site.
Required Equipment
A pallet jack or forklift is required to move the crates on a level surface. 
A stair crawler or other special equipment must be used to traverse stairways. Such 
equipment must be able to transport at least 1,091 lbs. (495 kg).