Краткое Руководство По Установке для ASUS RS720-E7/RS12

Скачать
Страница из 16
Cache Vault Accessory Kit 
Installing the Cache Vault Kit on the holder 
and the PIKE card
Install the Cache Vault Flash Module on the PIKE 2208 card, and follow the steps 
below to install the Cache Vault Power Module on ASUS steel CVPM holder.
Installing the Cache Vault Power Module on the steel clip and holder
1.  Locate the three screw holes on 
ASUS steel CVPM clip holder.
3.   Align the three screw holes on 
the clip with the three screw holes 
on the holder, then secure the clip 
with the bundled screws (2).
4.   Install the Cache Vault Power 
Module to the LSI® steel 
CVPM clip.
2.  Find the LSI
®
 steel CVPM clip 
for securing the Cache Vault 
Power Module.
Standard installation of Cache Vault power module
Some specific ASUS server systms have a specific space for installing Cache Valut Power 
module, allowing you the use of all your system’s expansion slots. For generally standard 
installation, please follow the steps below.
1.   Install the Cache Vault Power Module on the full-height or half-height steel bracket 
according to the type of expansion slots on your server system as shown below.
CVPM installed on the full-height steel 
bracket, secured with the bundle screws (3).
CVPM installed on the half-height steel 
bracket, secured with the bundle screws (3).
3