Руководство По Установке для KitchenAid KXW9748YSS

Скачать
Страница из 36
8
Complete Preparation
1.  Determine and make all necessary cuts in the wall for the 
vent system. Install the vent system before installing the 
range hood. See the “Venting Requirements” section.
2.  Determine the location where the power supply cable will 
be run through the wall. Be sure that the location will be 
covered by the chimney of the range hood.
3.  Drill a 1
1
/
4
" (3.2 cm) hole at this location.
4.  Pull enough power supply cable through the wall to allow 
for easy connection to the terminal box.
5.  Install the 10" (25.4 cm) square x 10" (25.4 cm) round 
transition with damper to the top of range hood using 
the 3 - 4.2 x 8 mm screws.
NOTE: Your range hood requires you to purchase either an 
internal type or an in-line (external type) blower motor system.
For internal blower systems, there are blower motor mounting 
parts in the blower motor installation packet that must be added 
to the range hood prior to mounting the range hood to the wall. 
See the “Install Range Hood Internal Blower Motor” section and 
the instructions supplied with the blower motor.
Install Range Hood
1.  Remove the grease filter. See “Range Hood Care” section.
2.  Using 2 or more people, hang range hood on 2 mounting 
screws through the mounting slots on back of range hood.
3.  Level the range hood and tighten upper mounting screws.
4.  Install 2 - 5 x 45 mm lower mounting screws and tighten.
Install Range Hood Internal Blower Motor
NOTE: Your range hood requires you to purchase an internal 
type blower motor system. See “Blower Motor System” in the 
“Accessories” section.
Prepare the Internal Blower System
IMPORTANT: Perform steps 1-4 before mounting the 
range hood.
1.  Remove grease filters from range hood. See the 
“Range Hood Care” section.
2.  Install the 6 mm nuts to the outside top of the range hood 
at the proper location for the selected motor system.
 
Two 6 mm nuts are required for the single motor system. 
Clip the nuts into the small square notches located at the 
left and right sides (centered) of the square to round vent 
transition.
 
Five 6 mm nuts are required for the dual motor system. 
Clip the nuts into the small square notches, one located 
in the front of the square to round vent transition and the 
other four located at the left and right ends of the square 
to round vent transition.
3.  Disconnect the electrical connector to the heat lamp.
A
B
A.  Mounting screws
B.  Mounting slots
A
A.  Lower mounting screws
A
A
A
B
A.  Clip nut (6 mm) locations for dual motor assembly (quantity 5)
B.  Clip nut (6 mm) locations for single motor assembly (quantity 2)