Руководство По Установке для Cisco Cisco 1 GHz GainMaker Amplifier

Скачать
Страница из 132
 
Installing Accessories 
 
Make sure that the components face the outside of the station (see diagram for 
proper positioning). Heat shrink tubing has been added to prevent shorting. 
4  Replace the amplifier cover and tighten the amplifier cover screws from 10 in-lb 
to 12 in-lb (1.12 Nm to 1.35 Nm). 
Important: Install the amplifier module cover properly, or RF signal degradation 
may result. 
5  Install other options or accessories as desired, or proceed to 
Installing the 
Amplifier Module (on page 38). 
 
To Install the Plug-in Signal Director (Low and High Gain Dual Only) 
Complete the following steps to install the signal director in the amplifier. 
1  Begin this procedure with the housing open. Refer to 
To Open the Node Housing 
(on page 19). 
Note: This accessory can be installed without removing the amplifier cover. 
2  Choose the correct signal director for your system as specified by the design print. 
If you are installing a ... 
This will ... 
Jumper, part number 4008208 
activate only one auxiliary port. 
Splitter, part number 4008364 
activate both auxiliary ports with equal 
signal levels. 
8 dB Coupler, part number 4008365 or 
12 dB Coupler, part number 4008366 
activate both auxiliary ports with differing 
signal levels. 
3  Install the signal director in the signal director slot. Refer to the illustration below. 
 
Important: Be sure that the signal director is oriented in the proper direction for 
your system. Rotating the signal director in the slot will change which ports are 
activated by which signal. Refer to the following table to determine the 
orientation appropriate for your system installation. 
Note: Be sure that all pins on the signal director bottom align with the pin holes in 
the signal director slot, allowing the signal director to install flat against the 
amplifier module. 
 
 
OL-31156-01 
35