Руководство По Установке для Cisco Headend System Release 2.7
Final System Validation Tests
4023737 Rev C
93
Final System Validation Tests
Verifying a Successful Installation
1 Complete the following steps to perform a slow boot and a fast boot on a DHCT
with a working return path (2-way mode).
a Boot a DHCT.
a Boot a DHCT.
Note: Do not press the Power button.
b Access the Power On Self Test and Boot Status diagnostic screen on the
DHCT and verify that all parameters, except UNcfg, display Ready.
Note: UNcfg displays Broadcast.
c Wait 5 minutes.
d Press the power button on the DHCT. Power to the DHCT is turned on.
e Access the Power On Self Test and Boot Status diagnostic screen on the
d Press the power button on the DHCT. Power to the DHCT is turned on.
e Access the Power On Self Test and Boot Status diagnostic screen on the
DHCT.
f Do all of the parameters, including UNcfg, display Ready?
–
If yes, go to step 2.
–
If no, contact Cisco Services.
2 Ping a test DHCT.
3 Did the DHCT receive the ping?
3 Did the DHCT receive the ping?
If yes, go to step 4.
If no, call Cisco Services.
4 Stage at least one new DHCT to the system operator’s specifications.
5 After staging, did the DHCT successfully load the current client release
5 After staging, did the DHCT successfully load the current client release
software?
If yes, go to step 6.
If no, call Cisco Services for assistance.
6 Did the DHCT receive at least 33 EMMs (Entitlement Management Messages)
and successfully receive its Entitlement Agent?
If yes, go to step 7.
If no, call Cisco Services for assistance.
7 Does the IPG display 7 days of valid and accurate data?
If yes, go to step 8.
If no, call Cisco Services for assistance.