Руководство По Установке для Cisco Cisco Packet Data Gateway (PDG)

Скачать
Страница из 195
  Technical Specifications 
Mounting Requirements  ▀   
 
ASR 5500 Installation Guide  ▄  
 
   
33 
Mounting Requirements 
Each ASR 5500 chassis occupies 21 RU (rack units) within any standard (EIA-310-D, IEC 60297) 19-inch (482.6 mm) 
equipment rack or cabinet using the mounting brackets supplied with the chassis. Extension brackets (not supplied) may 
be used in conjunction with the chassis mounting brackets to install the chassis in a standard 23-inch (584.2 mm) 
cabinet or rack. The chassis mounting brackets may be repositioned to support flush and mid-mount installations. 
The chassis footprint is approximately 19-inch (48.26 cm) wide by 26.75 in. (67.9 cm) long.  
Important:
  This footprint does not include the rear-mounted cable management tray. 
Two ASR 5500 chassis fit in 42 RU (73.5 in.) of space within an equipment rack or cabinet. 
Important:
  Rack mounting requires the use of industry-standard equipment racks or cabinets with supplier-
recommended fasteners. The rack should be rated to accommodate the weight of one or two chassis and any auxiliary 
equipment.