Installation Procedure Overview   
▀  Installation Sequence 
 
 
▄  ASR 5500 Installation Guide 
38 
   
Installation Sequence 
Installation of the ASR 5500 requires the completion of the following procedures: 
1.  Unpack the chassis and cards.
 
2.  Determine which chassis mounting option to use: flush or mid-mount. Reposition the mounting brackets if 
necessary.
 
3.  Install the chassis into a standard 19-inch equipment rack or telecommunications cabinet.
 
4.  Connect the chassis ground point to site ground.
 
5.  Optional: Install the Cable Management System.
 
6.  Install SSC and FSC cards into the front of the chassis.
 
7.  Install MIO/UMIO cards and DPC/UDPCs or DPC2/UDPC2s into the rear of the chassis.
 
8.  Connect data cables to the local and external ports.
 
9.  Connect power cables to the PFU terminals at the top rear of the chassis.
 
10. Apply power to the chassis.
 
11. Verify that the system powers up successfully.
 
The actual sequence for completing some of the above procedures may be adapted to suit local requirements and the 
availability of resources. For example, power cabling may be completed before circuit cards are installed in the chassis. 
However, the chassis must always be grounded immediately after being mounted in the rack or cabinet. 
Caution:
  For personal safety and to minimize the risk of equipment damage, power must not be applied to the 
chassis until all other procedures have been completed.