Руководство По Устранению Ошибки для Cisco Cisco Packet Data Gateway (PDG)

Скачать
Страница из 225
Engineering Rules   
▀  GTP Engineering Rules 
 
▄  Cisco  ASR 5000 Series Gateway GPRS Support Node Administration Guide 
OL-22943-01   
GTP Engineering Rules 
The following engineering rules apply to GTP on GGSN: 
 
A maximum of 11 primary (no secondary) PDP context per subscriber can be configured. 
 
A maximum of 1 primary and 10 secondary PDP context per subscriber can be configured.