для Cisco Cisco Packet Data Gateway (PDG)

Скачать
Страница из 655
  SGSN Changes in Release 17 
SGSN Enhancements for 17.2  ▀   
 
Release Change Reference, StarOS Release 17  ▄  
 
   
481 
SGSN Enhancements for 17.2 
This section identifies all of the SGSN enhancements included in this release: 
Feature Changes - new or modified features or behavior changes. For details, refer to the SGSN Administration Guide 
for this release. 
Command Changes - changes to any of the CLI command syntax. For details, refer to the Command Line Interface 
Reference
 for this release. 
Performance Indicator Changes - new, modified, and deprecated bulk statistics, disconnect reasons, counters and/or 
fields in new or modified schema and/or show command output. For details, refer to the Statistics and Counters 
Reference
 for this release. 
Important:
  This release includes enhancements that are applicable to multiple products. The following lists the 
various multi-product enhancements sections, some of which might include content applicable to your SGSN. 
 
AAA Enhancements  
 
CF Enhancements 
 
ECS Enhancements 
 
Firewall Enhancements 
 
GTPP Enhancements 
 
Lawful Intercept Enhancements 
 
MVG Enhancements 
 
NAT Enhancements 
 
SNMP MIB Enhancements 
 
System and Platform Enhancements 
CSCus06673 - RAB Setup Fails with cause invalid-rab-parameters-combination 
Feature Changes 
GGSN initiated PDP-modification Call-flow Modified
 
Previous Behavior:  The RNC RAB-modification procedure is release-and-establish with Direct Tunnel enabled, the 
GGSN initiated PDP-modification call-flow for a successful case is as follows:  
1.  An UPCQ from GGSN is received for a PDP-context. 
2.  MS modify request and MS modify accept procedures occur. 
3.  RAB-release and RAB-assignment procedures occur. 
4.  An UPCR is sent to the GGSN with cause “Accepted” along with the DTI information. 
New Behavior:  The RAB-release and establishment is done after acknowledging the GGSN modification with UPCR 
without direct tunnel. This is followed by UPCQ with Direct tunnel information from SGSN post rab-assignment 
success. The modified call-flow during RNC RAB modification procedure is as follows: