для Cisco Headend System Release 2.7
Chapter 3 Staging SSC DHCTs
76
736107 Rev D
13 Does your business process require inventory DHCTs to be authorized for
service?
If yes, go to step 14.
If no, downgrade (disable) the DHCTs in accordance with your site process,
wait for the Brick mode indicator or loss of secure services, and then go to
step 14.
14 Disconnect the DHCTs and either return them as staged inventory to your
warehouse or give them to technicians to install at the subscribers' locations.
Note: Some sites reverse steps 13 and 14 to let the installers see services during the
installation before having the DHCT receive a hit with the subscriber's contracted
services. If your site does this, the DHCT will only display services if the DHCT is
installed within the EMM timeout period (by default, 30 days). After the timeout
period, the DHCT will need to receive a hit before it can display any secure services.