Руководство По Установке для Cisco Headend System Release 2.7
Chapter 5 SR 5.0 Post Upgrade Procedures
84
4042225 Rev A
9 Click Show from the DNCS row.
Results:
The DNCS Process Status window appears.
Green indicators replace red indicators as the DNCS processes start.
10 From the dncs xterm window on the DNCS, type the following command and
press Enter. The dncsControl utility window opens.
dncsControl
11 Type 2 (for Startup/Shutdown Single Element Group) and then press Enter. The
dncsControl window updates to list the available applications for
Startup/Shutdown.
Startup/Shutdown.
12 Type 1 (for dncs) and press Enter. The dncsControl window updates to list the
goal states.
13 Type e (for Display Groups) and press Enter. The dncsControl window updates
to list the status of all of the processes and servers running on the DNCS.
14 Wait for the dncsControl window to list the current status (Present State) of all
processes and servers as running.
Notes:
Notes:
The dncsControl window updates automatically every few seconds, or you
can press Enter to force an update.
can press Enter to force an update.
The indicators on the dncsControl window all become green when the
processes and servers have restarted.
processes and servers have restarted.