Руководство Пользователя для Cisco Cisco Tidal Enterprise Scheduler 6.2
9-286
Cisco Tidal Enterprise Scheduler 6.2 User Guide
6.2.1
Chapter 9 Variables
Variables Interface
•
Calculated
– This check box appears only if the
Date
option is selected in the
Type
field. Select
this option to make the variable calculate a date based on a formula. Selecting this check box, makes
the
the
Value
field unavailable since the value will be calculated and displays a
Browse
button at the
end of the field. Clicking this
Browse
button displays the
Date Calculation
dialog.
•
Description
– This is an empty text field for typing a description or notes about the variable.
•
Public
– When selected, this option makes the variable available to all TES users on the master. You
can make this option default to either selected or cleared from the
System Configuration
dialog,
Defaults
tab.
•
Publish this variable to remote masters
– The variable is available for use by other masters.
•
Read only
– The defined variable is available to other masters but the variable can not be modified.
(This option is only available if the
Publish this variable to remote masters
option was
selected.)
Date Calculation Variable Dialog
If you wish to use a specific calendar date for the date value then simply enter the date in a specified
format. The date format is defined on the
format. The date format is defined on the
Date
tab of your computer’s
Regional Options
setting
(
Start>Settings>Control Panel>Regional Options
).
If you wish to calculate a date, then you must configure the formula to be used in creating the date
variable. You associate a date calculation with a variable from the
variable. You associate a date calculation with a variable from the
Date Calculation
dialog.
To display the
Date Calculation
dialog:
Step 1
Select the
Date
option in the
Type
field of the
Variable Definition
dialog.
Step 2
Select the
Calculated
option.
Step 3
Click the drill-down button in the
Value
field to display the
Date Calculation
dialog.
This dialog contains the following elements:
–
Calendar Start Section
– The fields that are available in the
Date Calculation
dialog vary
according to the option selected in the
Starting with
field in the
Calendar Start
section.
Some fields are unavailable with certain options while other options display new fields.
Starting with
– The starting point of the date calculation. All defined offsets are offset from
this date. As soon as an option is selected from the drop-down list, the resulting date displays
in parentheses to the right of the field.
in parentheses to the right of the field.
The possible starting points of the date calculation and their definition are listed in the following table:
Table 9-1
Date Calculation Options
Date Calculation Starting Points
Definition
System Date
The date displayed in the computer system.
Usually this is the same as the current date.
Usually this is the same as the current date.
Production Date
The date used when scheduling production
schedules. This may differ from the current date if
a production offset has been configured.
schedules. This may differ from the current date if
a production offset has been configured.