Справочник Пользователя для Samsung AP80S0AN

Скачать
Страница из 56
51
ENGLISH
Check lists after completing the installation
X
f
After completing the installation, you must check the following.
Installation
Indoor unit
•  Have you checked the external surface and the internal part of the indoor unit?
•  Is the place well-ventilated and ensures space for service?
•  Have you checked if the center of the indoor unit is ensured and it is installed horizontally in 
level?
•  Have you connected refrigeration pipes properly? 
Outdoor unit
•  Have you checked the external surface and the internal part of the outdoor unit?
•  Is there any possibility of short circuit due to the heat of an outdoor unit?
•  Is the place well-ventilated and ensures space for service?
•  Is the outdoor unit fixed securely?
Refrigerant pipe work
•  Have you checked for any gas leakage?
•  Are the length and the height difference between the refrigerant pipes within the allowable 
range?
•  Have you properly insulated pipes?
•  Is the quantity of the additional refrigerant correctly weighed in?
•  You must record the amount of additional refrigerant charging on the service record label 
placed outside the outdoor unit.
Installing the drain pipe
•  Have you completed the drain test?
•  Is the drainpipe properly insulated?
Wiring work
•  Have you checked for interference between the power and the communication cable?
•  Have you performed the earthing work 3 to the outdoor unit?
•  Is the length of the wire within allowable range?
•  Is the wiring route correct?
•  Have you used verified power supply cable and the communication cable?
Option
•  Check whether the vibration-resistance frame is correctly installed if there is a possible 
vibration of the outdoor unit.
PAC_아프리카 중동향AP80S0A_IBIM_34514A-02_EN.indd   51
2015-04-23   오후 2:19:00