Руководство Пользователя для Alcatel-Lucent OmniAccess 3500

Скачать
Страница из 4
•  A PC with an Ethernet port and a web browser. 
•  The capability to execute the ktpass command on the Active Directory Server 
(ADS) of the enterprise. 
•  A certificate and associated private key file for the gateway. 
•  The certificate of the issuing authority for the gateway certificate. 
The gateway has the following environmental and airflow requirements: 
•  The installation site must maintain at any time the operational temperature and 
the humidity levels listed in the Specification and Compliance section of the 
Gateway Installation Guide
•  Adequate room for proper air ventilation must be allowed at the front, back, and 
sides of the appliance. No clearance is necessary at the top or bottom of the 
appliance. 
The gateway has the following general electrical requirements: 
•  One grounded electrical outlet must be available for the AC power supply of the 
gateway.  
•  To connect the gateway to the grounded electrical outlet, use the supplied AC 
power cord. Do not use extension cords. 
Hardware Overview 
The following figures illustrate front and back views of the gateway. 
 
Figure 1 - Gateway front view 
 
Figure 2 - Gateway back panel