Инструкции По Обслуживанию для kymco mo zx50

Скачать
Страница из 5
5
. ENGINE REMOVAL/INSTALLATION
5-4
ZX / SCOUT 50
ENGINE HANGER BRACKET
INSPECTION
Inspect the stopper rubbers and bushings
for damage and replace with new ones if
necessary.
ENGINE INSTALLATION
Install the engine in the reverse order of
removal.
Torque Values:
Engine mounting bolt : 4.5_
5.5kg-m
Rear shock absorber lower mount bolt:
 2.4_
3.0kg-m
Perform the following inspections and
adjustments after installation.
• Throttle cable
• Oil pump control cable (!3-10)
• Rear brake cable (!3-4)
• Oil pump bleeding (!4-5)
Cables and wires should be routed
properly.
Bushings
Engine Hanger
Stopper Rubbers