Справочник Пользователя для Alliance Laundry Systems nx18bvqa7

Скачать
Страница из 20
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
Maintenance
9001910
16
Weekly Preventive Maintenance 
Checklist
Machine 
____________________________
Operator
 ___________________________
Month __________
Week Ending: 
Checks
/
/
/
/
/
1. Check the machine for leaks:
a. Start an unloaded cycle to fill the machine.
b. Verify that door and door gasket do not leak.
c. Verify that the drain valve is operating.
2.
3.
4.
5.
6.
7.