Справочник Пользователя для Pelco C1572M

Скачать
Страница из 67
34
C1555M-F (10/05)
System Start-Up
To start up your system you must complete the following tasks:
1. Install the CM9700-MGR on a PC connected to the CC1. 
2. Complete the following steps on the CM9700-MGR PC (instructions are provided in the CM9700-MGR Software Guide):
a.
Copy the CM9700 system design file (the *.psm file) to the PC.
b.
Start the CM9700-MGR software.
c.
Open the system design file, and then customize the system as necessary. This step is optional because the *.psm file is defined at 
the factory based on your system order.
OR
If your system order did not include the factory configuration process, your first step is to set up your system. Refer to How to 
Configure a New System
 in the CM9700-MGR Software Guide for instructions. 
3. Initialize the CC1. Refer to following section for instructions.
4. If you make any changes to the *.psm file, you must transfer the updated system settings to the CC1. Refer to Transferring System Settings 
to the CC1 in the CM9700-MGR Software Guide for instructions.
INITIALIZE THE CC1
1. Apply power to all peripheral equipment connected to the CC1.
2. Apply power to the CC1.
Initialization begins when the CC1 is turned on and the DOS boot process executes. 
When the boot process calls the executable in the autoexec.bat file, the CC1 diagnostic screen appears on the VGA monitor. The 
initialization process is complete when the message “Setup Complete” appears at the bottom of the screen.
Figure 25.  CC1 Initialization