Справочник Пользователя для Pelco SS4722L

Скачать
Страница из 4
2
Pelco Manual C1409M-C (7/98)
3.0  INSTALLATION
3.1  SS4718/SS4722/
The sun shroud is supplied with two (2) threaded spacers and two (2) Phillips head
 SS4718L/SS4722L
screws.
 SUN SHROUDS
To install the sun shroud, perform the following steps (refer to Figure 1).
1.
Unlatch and raise enclosure lid.
2.
Remove the two (2) screws, nylon washers, nuts and lock washers from the lid
of the enclosure.
3.
Attach the threaded spacers to the under side of the sun shroud with the two
(2) screws and nylon washers previously removed, threading them through
the top of the sun shroud.
4.
Align the spacers in the sun shroud with the holes in the enclosure lid. Attach
the sun shroud to the enclosure lid with the remaining lock washers and screws.
Tighten screws securely.
3.2 TI47 THERMAL
The TI47 thermal insulation sheets are designed to be used with both 18-inch
INSULATION
(45.72 cm) and 22-inch (55.88 cm) EH4700 Series enclosures. If insulation is
required for an 18-inch enclosure, the insulation must be cut along the factory-
marked perforation. For 22-inch installations, no trimming is necessary. To install
the thermal insulation, perform the following steps:
3.2.1 Lid Insulation
1.
Unlatch the enclosure lid and raise.
Installation
2.
Pop the gas spring off of the lid at the ball-joint connection. Make sure the lid is
supported and not allowed to lay completely open - doing so will damage the
lid hinge.
3.
Remove the adhesive backing from the “lid” insulation pad (see Figure 2).
4.
Position the insulation around the sun shroud fasteners on the inside of the lid. It
may help to hold the insulation in a folder manner while positioning. Remove the
necessary punch-out holes in the insulation to accommodate the fasteners.
NOTE:  
The camera mounting sled
must be removed for proper installa-
tion of the thermal insulation, there-
fore, it should be done prior to the
enclosure installation.
Figure 2.  Lid Insulation Installation
Figure 1.  Sun Shroud Installation