Справочник Пользователя для Chamberlain 3585c 3-4hp

Скачать
Страница из 76
Header
Bracket
Belt Pulley
Bracket
Temporary
Support
Header Wall
Garage
Door
Clevis Pin
5/16"x2-3/4"
Ring 
Fastener
Header 
Bracket
Belt Pulley
Bracket
Rail
10
Clevis Pin
5/16"x2-3/4"
Ring Fastener
INSTALLATION STEP 3
Attach the Rail to the Header Bracket
• Position the opener on the garage floor below the
header bracket. Use packing material as a protective
base. NOTE: If the door spring is in the way you’ll need
help. Have someone hold the opener securely on a
temporary support to allow the rail to clear the spring.
• Position the rail bracket against the header bracket.
• Align the bracket holes and join with a clevis pin
as shown.
• Insert a ring fastener to secure.
HARDWARE SHOWN ACTUAL SIZE