Page 4
Boiler Diagnostics
Easy Setup Guide
For a quick and easy installation, complete the following steps below in order.
Each step is explained in more detail on the followi pages.
Note: Not all steps are required for each type of installation – see the table
below for details:
Each step is explained in more detail on the followi pages.
Note: Not all steps are required for each type of installation – see the table
below for details:
Step Description
BDM plus new
HAH
BDM with
existing HAH
BDM only
1
Install Hub
• Connect the hub to the
• Connect the hub to the
household’s broadband router
• Connect the power cable
• Wait until the status light
• Wait until the status light
flashes amber
✓
not required
if Hive Hub
already present
✓
(not required
if Hive Hub
already present
2
Remove existing Receiver
• Remove the old Hive Receiver
• Label existing wiring
• Remove the old backplate
• Remove the old Hive Receiver
• Label existing wiring
• Remove the old backplate
✓
3
Install BDM with new backplate
• Install the new backplate and
• Install the new backplate and
wire into boiler
• Plug temperature sensors onto
the BDM
• Plug the BDM module onto the
new backplate
✓
✓
✓
4a Commission Hive Active Heating
✓
✓
4b Commission Boiler Diagnostics
✓
✓
✓