Справочник Пользователя для Lord Corporation MSLINK0002
MicroStrain, Inc.
Appendix 6: Bridge Completion Resistors
The picture below shows how to determine what bridge completion is in place on your
SG-Link® OEM. Jumpers (shorts) provide a direct connection between circuit points;
resistors will have the value of the specified bridge completion.
SG-Link® OEM. Jumpers (shorts) provide a direct connection between circuit points;
resistors will have the value of the specified bridge completion.
• The Yellow at R12 and R18 are ½ and ¼ bridge completion.
• The Green at SH1 is a short for ½ bridge only.
• The Green at SH1 is a short for ½ bridge only.
• The Red at R13 is ¼ bridge completion.
• If none of the jumpers/resistors are in place, the completion is full bridge.
71