Справочник Пользователя для Lord Corporation MSLINK0002

Скачать
Страница из 71
 
MicroStrain, Inc. 
Appendix 6: Bridge Completion Resistors 
The picture below shows how to determine what bridge completion is in place on your 
SG-Link® OEM. Jumpers (shorts) provide a direct connection between circuit points; 
resistors will have the value of the specified bridge completion. 
 
 
 
•  The Yellow at R12 and R18 are ½ and ¼ bridge completion. 
•  The Green at SH1 is a short for ½ bridge only. 
•  The Red at R13 is ¼ bridge completion. 
•  If none of the jumpers/resistors are in place, the completion is full bridge. 
 
 
71