Section 1 : Introduction 
 
 
2015_2000007248-V1 - Draft 
This document and the information therein are the property of Morpho. They must not be 
copied or communicated to a third party without the prior written authorization of Morpho 
14 
June 2015 
 
 
Recommendations for terminal implementation 
Every  installation  is  unique.  Sometimes  the  issues  are  well  defined  and  can  be 
handled in a standard fashion; sometimes the issues are very specific and may not be 
immediately recognizable. 
Morpho recommends following these steps for a successful installation: 
 
Plan the installation - Choose the type of hardware required, decide if a network 
is required, and decide on the location and number of required terminals. 
 
Unpack all items - Unpack all items and check against the packing list. 
 
Install  network  hardware  components  -  Install  the  cabling  and  components 
needed to run the system. 
 
Install software - Install the software needed to set up the terminals. 
 
Pre-configure device - Connect the terminals to the Ethernet, supply power to the 
terminals, and pre-configure the terminals. 
 
Mount devices - Mount the terminals in their final locations 
 
Power  distribution  and  device  hook  up  -  Connect  the  terminals  wiring  via  the 
back panel. 
 
Power-up  procedure  -  Check  the  power  connections,  and  then  start  the  system 
safely.