Справочник Пользователя для Meru Networks Inc. OAP433E

Скачать
Страница из 61
 
• 
RF coaxial cable to connect the antennas to the OAP433e 
• 
Drill (if wall-mounting) 
• 
Crescent wrench 
• 
Outdoor CAT5 Ethernet cable, Cable type CMX 
o
 
Size 22 (American Wire Gauge) with a 3.8mm gap 
o
 
Size 24 (AWG) with a 3mm gap 
Note 
The Ethernet cable must be run through the OAP433e’s water-tight input port, 
which is provided in the package. This will ensure a waterproof seal around the 
connection. Follow the instructions listed later in this chapter to properly install the 
cable. 
6.3 
Power Requirements 
The OAP433e does not ship with a power adapter, and as such, must be powered 
by a PoE device. In order to ensure that all three radios on the AP are active, it 
must be plugged into an 802.3at power source. If an 802.3af source is used, the 
third radio will be disabled due to insufficient power. 
6.4 
Assembling the Waterproof Ethernet Connector 
The OAP433 ships with a separate Ethernet connector that must be disassembled 
in order to run a cable through it. Once tightened and connected to the AP itself, 
this connector will ensure a waterproof seal for the AP. 
To run an Ethernet cable through the waterproof connector: 
• 
Unscrew the two main components of the connector. 
• 
Remove the insert from the larger portion of the connector. This should 
be a rubber casing surrounded by a plastic shell. Both the plastic shell 
and the rubber casing should have a slit along one side, allowing them to 
be opened up in order to insert the cable. 
• 
Prior to attaching the rubber casing to the cable, run the cable through 
the smaller portion of the original two-part enclosure. Be sure to run the 
cable through the smaller opening (at the top of the plastic component) 
so that the head of the cable goes towards the AP. (Note that this step 
can be done after the rest of the connector has been assembled, but it 
can be difficult to do so when deploying long cables, so it’s best to do it 
here instead.) 
• 
Run the Ethernet cable through the slit in the rubber casing and ensure 
that the casing wraps firmly around the cable. The Ethernet connector at 
the end of the cable should be on the larger side of the rubber casing. 
• 
Replace the larger plastic component (the one that has threading on both 
ends) such that it fits around the rubber casing with the plastic shell. The 
portion of the component with a large rubber washer should be facing the 
end of the Ethernet cable (which will be connected to the AP). 
• 
Connect the Ethernet cable to the port on the AP and screw the plastic 
threading in place. This should be tightened firmly, but should not require 
excessive force.  
• 
Finally, screw the last plastic portion to the top of the threading. Again, 
tighten this firmly, but not excessively. The gap between the top cap and 
the base of the threading component should be 3mm when using a 
24AWG cable or 3.8mm when using a 22AWG cable. 
Now that the Ethernet cable connection has been fully assembled, the AP is ready 
to be deployed. 
6.5 
Installing the Access Point 
When you plan the OAP433e physical configuration, include the elements shown 
in this Figure 28, SAmple physical layout