MC-Series High-Power System 
 
Final Checkout and Commissioning 
998--01 Rev X1 
RadioFrame Networks, Inc. 
CONFIDENTIAL AND PROPRIETARY 51 
 
 
5.2  Checkout Procedures 
1  Verify that all breakers in the PDU are in the OFF position prior to proceeding. 
Leave them in the OFF position until instructed otherwise. 
2  Conduct a visual inspection of the cabling on the rear of the cabinet verifying that all 
connections are in place, tight, and complete. 
3  Add and remove RadioBlade transceivers according to the site configuration. Refer 
to section 7.9.4 “RadioBlade Transceiver Replacement“. 
4  Verify that cabling matches the site configuration. 
Refer to Appendix C “High-Power iDEN Microcell Rack Stack-Up, 3-Sector (Default) 
Configuration”.  
5  Install 50 Ω 2 W terminators on all unused Tx / Rx / Diversity ports on the top of the 
cabinet. 
6  Verify that there is DC power at the supply terminals on the PDU and that the 
polarity is correct. Refer to section 2.5 “Specifications” for more information. 
5.3  Initial Powering Procedure 
1  Verify that all breakers in the PDU are in the OFF position. 
2  Ensure that the power switches on the iSC-3s and the EAS are all in the OFF 
position. 
3  Using the breakers on the PDU, turn up the equipment by completing the following 
steps, verifying that each component is operational before proceeding to the next 
step. 
4  Using the breaker on the PDU and the power switch on the front of the primary iSC-
3, turn up the primary iSC-3, and then verify that it is operational and that GPS lock 
has been established before proceeding. For more information, refer to the 
Motorola document Gen 3 Site Controller System Manual, 68P80801E30-O. 
5  Using the breaker on the PDU and the power switch on the front of the EAS, turn up 
the EAS, and then verify that it is operational before proceeding. For more 
information, refer to the Motorola document Gen 3 Site Controller System Manual
68P80801E30-O. 
6  Using the breaker on the PDU and the power switch on the front of the secondary 
iSC-3, turn up the secondary iSC-3, and verify that it is operational before 
proceeding. For more information, refer to the Motorola document Gen 3 Site 
Controller System Manual
, 68P80801E30-O. 
7  Using the breaker on the PDU, turn up the CSU. 
8  Configure the CSU according to the manufacturer's documentation and Sprint 
Nextel standards.  
9  Using the breaker on the PDU, turn up the BIC, AIC and RBS 1, and then verify that 
all three components are operational before proceeding. 
 
Caution! 
Verify that all breakers in the PDU are in the OFF position prior to proceeding. 
Leave them in the OFF position until instructed otherwise.