Справочник Пользователя для ip.access ltd M180TVX

Скачать
Страница из 40
 
© ip.access Ltd 
 
COMPANY CONFIDENTIAL 
110#010XA_GDE.doc 
- 4 -
 
 
Table of Contents 
Table of Figures............................................................................................................................5
 
Warnings and Cautions................................................................................................................6
 
Introduction...................................................................................................................................7
 
The nanoBTS ..............................................................................................................................7
 
Installing the nanoBTS.................................................................................................................9
 
Pre-Installation Checklist.............................................................................................................9
 
Installing the nanoBTS ................................................................................................................9
 
Unpacking nanoBTS .................................................................................................................10
 
Provision of Power to the nanoBTS ..........................................................................................11
 
Installing the PSU at the Ethernet switch. .............................................................................11
 
Installing the PSU at the nanoBTS. .......................................................................................12
 
Mounting the nanoBTS..........................................................................................................12
 
a) Fixing to a wall...................................................................................................................12
 
b) Fixing to a ceiling or a sloping surface ..............................................................................14
 
Preparation for configuring nanoBTS........................................................................................14
 
Configuring the nanoBTS ..........................................................................................................15
 
Step 1.
 
Setting up PC for configuring nanoBTS ..................................................................15
 
Step 2.
 
Connecting the nanoBTS........................................................................................16
 
Step 3.
 
Setting IP addresses and downloading software ....................................................17
 
Step 4.
 
Calibration of nanoBTS using frequency synchronisation.......................................18
 
Step 5.
 
Check macro network channel usage.....................................................................19
 
Step 6.
 
BCCH Channel Usage Test ....................................................................................21
 
Step 7.
 
Retrieve BCCH frequency information....................................................................21
 
Step 8.
 
Measuring path loss between nanoBTS .................................................................22
 
Step 9.
 
Walk Test................................................................................................................26
 
Step 10.
 
Installation Report ...................................................................................................26
 
Regulatory Compliance..............................................................................................................27
 
Appendix 1: Modifying nanoBTS for use with external antenna ...........................................28
 
Appendix 2:  Alternative method to set frequency of nanoBTS oscillator ...........................30
 
Appendix 3:  Commissioning at the nanoBTS.........................................................................34
 
Appendix 4:  Commissioning mostly at the NOC....................................................................35
 
Appendix 5 Troubleshooting .....................................................................................................36
 
Checking that the nanoBTS has successfully downloaded an IP address ...............................36
 
Resetting the nanoBTS to factory default settings. ...................................................................36
 
Communication Problems.........................................................................................................37
 
No LEDs ................................................................................................................................37
 
LED is on but is flashing orange (1sec on, 1sec off) .............................................................37
 
No communication between the nanoInstaller and the BTS .................................................37
 
Clock Adjustment Problems......................................................................................................38
 
No 26MHz clock during Frequency adjustment.....................................................................38
 
Unsettled 26MHz during frequency adjustment.....................................................................38
 
Problems During Beacon Test ..................................................................................................38
 
No signal seen on other nanoBTS during beacon test ..........................................................38
 
Glossary of Terms and Abbreviations......................................................................................39