SECTION 4: PRODUCT INSTALLATION
637246.DOC
Page
18
Post Installation Checklist
The following table lists the tasks that should be performed upon completing installation.
TABLE 5: POST INSTALLATION CHECKLIST
NO. CHECKLIST
ITEM
;
1
Scope out the entire area setup to locate any obvious problem areas.
2
Check antenna routing for safety concerns and near-field boundary setup.
3
Use tie wraps, where possible to ensure that all cables routed in parallel are
bundled together.
bundled together.
4
Perform appropriate testing to ensure base station works properly.
Once installation is complete make sure the area is clear of debris that would prevent proper
airflow and ventilation.
airflow and ventilation.