Справочник Пользователя для Honeywell International Inc. RTU-B07

Скачать
Страница из 32
Mounting the Unit on the Wall
Page 16
Vertical Assembly
Vertical Assembly
Vertical Assembly
Vertical Assembly
To assemble the unit in a vertical position, follow these steps:
1. Drill two holes in the wall (to accommodate the 2 plastic dowels),
so that the frame will cover the hole through which the cables
pass.
2. Insert the cables in the cable clamp without pulling out the screws.
3. Use the dowels to fasten the frame to the wall. Make sure that
the lamellar connector is in the UP position.
4. Adjust the length of the cables so that they protrude by ~10cm
from the wall, and fasten them to the cable crimp.
5. Fasten the cable crimp to the contacts in the direction shown in
Figure 9.
6. Place the remainder of the cable inside the frame and lock the cable
clamp.
NET
1
NET
2
GND
+1
2V
             
NET
1
NET
2
GND
+1
2V
NET
1
NET
2
GND
+1
2V
Figure 9: Wall position — vertical assembly