Справочник Пользователя для Charles Machine Works Inc The CMW-300ST
300SR/ST - OPERATION
37
LOCATE: BEACON
300SR/ST - OPERATION
37
LOCATE: BEACON
LOCATE: BEACON
If equipped, trace non-metallic pipes or conduits by locating and
following a 29 kHz beacon signal.
following a 29 kHz beacon signal.
IMPORTANT: Large metal objects and other signals (such as
railroad signals or overhead power lines) can distort signal.
railroad signals or overhead power lines) can distort signal.
Setup
To set up for beacon location:
1.
Follow beacon manufacturer’s instructions on battery
installation and testing beacon operation.
installation and testing beacon operation.
2.
Attach beacon to plumber’s snake or flex rod.
LOCATE: BEACON
If equipped, trace non-metallic pipes or conduits by locating and
following a 29 kHz beacon signal.
following a 29 kHz beacon signal.
IMPORTANT: Large metal objects and other signals (such as
railroad signals or overhead power lines) can distort signal.
railroad signals or overhead power lines) can distort signal.
Setup
To set up for beacon location:
1.
Follow beacon manufacturer’s instructions on battery
installation and testing beacon operation.
installation and testing beacon operation.
2.
Attach beacon to plumber’s snake or flex rod.