Installation
101
© Tait Limited March 2015
5.6.7
Connecting a 1PPS Source
A 1PPS signal is required for simulcast and P25 Phase 2 base stations. Use
a 50
a 50
Ω coaxial cable (RG58 or RG223) to connect the source to the base
station’s 1PPS input. You can daisy-chain up to eight base stations using
F-junctions. We recommend that the cable length between the first and last
load is kept to a minimum. This will reduce any propagation variation
between base stations. The maximum overall cable length is 30m.
Terminate the last connection (including single base stations) with a 50
F-junctions. We recommend that the cable length between the first and last
load is kept to a minimum. This will reduce any propagation variation
between base stations. The maximum overall cable length is 30m.
Terminate the last connection (including single base stations) with a 50
Ω
resistor, otherwise reflections of the 1PPS pulse may occur.
Notice For P25 Phase 2 operation the NTP signal must be linked to
the 1PPS signal. To ensure synchronization, both signals must come
from the same GPS source.
the 1PPS signal. To ensure synchronization, both signals must come
from the same GPS source.
5.6.8
Ethernet Connection
The RJ-45 socket on the reciter’s rear panel provides the 10BASE-T or
100BASE-T Ethernet connection to the other devices in the network. Use
Cat-5 cable to connect this socket to the Tait P25 Network via a router or
switch.
100BASE-T Ethernet connection to the other devices in the network. Use
Cat-5 cable to connect this socket to the Tait P25 Network via a router or
switch.
If necessary, refer to
for a list of
Ethernet connection pin allocations.
Figure 5.12 Daisy-chaining a 1PPS input
The longest length of cable must be between
the source and the first base station
use short lengths of cable
between each base station
maximum of eight base station
loads on one 1PPS output
50
Ω termination
(also needed for