TB9400 Installation and Operation Manual
Installation
101
© Tait Limited March 2015
5.6.7
Connecting a 1PPS Source
A 1PPS signal is required for simulcast and P25 Phase 2 base stations. Use 
a 50
Ω coaxial cable (RG58 or RG223) to connect the source to the base 
station’s 1PPS input. You can daisy-chain up to eight base stations using 
F-junctions. We recommend that the cable length between the first and last 
load is kept to a minimum. This will reduce any propagation variation 
between base stations. The maximum overall cable length is 30m. 
Terminate the last connection (including single base stations) with a 50
Ω 
resistor, otherwise reflections of the 1PPS pulse may occur. 
Notice For P25 Phase 2 operation the NTP signal must be linked to 
the 1PPS signal. To ensure synchronization, both signals must come 
from the same GPS source.
5.6.8
Ethernet Connection
The RJ-45 socket on the reciter’s rear panel provides the 10BASE-T or 
100BASE-T Ethernet connection to the other devices in the network. Use 
Cat-5 cable to connect this socket to the Tait P25 Network via a router or 
switch. 
If necessary, refer to 
 for a list of 
Ethernet connection pin allocations.
Figure 5.12 Daisy-chaining a 1PPS input
The longest length of cable must be between 
the source and the first base station
use short lengths of cable 
between each base station
maximum of eight base station 
loads on one 1PPS output
50
Ω termination
(also needed for
single base stations)