Publication Record
Issue
Publication Date
Description
1
May 2012
First release
2
November 2012
General updates for version 1.15 release.
Information added on compliance standards,
marshalling duration, firmware download
procedure, and restricted port numbers.
Information added on compliance standards,
marshalling duration, firmware download
procedure, and restricted port numbers.
3
May 2013
General updates for version 1.20 release
and the B3-band base station.
Front end tuning procedure added.
and the B3-band base station.
Front end tuning procedure added.
4
August 2013
General updates for version 1.25 release
and the H-band base station.
Information added for dual 50W and receive-
only base stations.
and the H-band base station.
Information added for dual 50W and receive-
only base stations.
5
November 2013
General updates for version 1.30 release.
Minor updates for receive-only base station.
Directive 1999/5/EC Declaration of
Conformity added.
Minor updates for receive-only base station.
Directive 1999/5/EC Declaration of
Conformity added.
6
April 2014
General updates for version 1.35 release.
PMU fan thresholds updated.
Information added on proximity to RF
transmissions, AAA Authentication, and
checking for interference on a receive
channel.
PMU fan thresholds updated.
Information added on proximity to RF
transmissions, AAA Authentication, and
checking for interference on a receive
channel.
7
August 2014
General updates for version 1.40 release.
Information added for K4-band receive-only
base station, and P25 Phase 2 operation.
Information added for K4-band receive-only
base station, and P25 Phase 2 operation.
8
November 2014
General updates for version 1.45 release.
Information added for P25 Phase 2 licenses.
Information added for P25 Phase 2 licenses.
9
March 2015
General updates for version 2.00 release.
Information added on P25 Phase 2
operation.
Information added on P25 Phase 2
operation.