Installation
TB9400 Installation and Operation Manual
© Tait Limited March 2015
P25 Phase 1
The requirements for an external frequency reference and a 1PPS signal are
set out in the following table.
set out in the following table.
An NTP source is also strongly recommended for P25 Phase 1 systems.
This will ensure log timestamps are synchronized, which will assist the
diagnosis of faults.
This will ensure log timestamps are synchronized, which will assist the
diagnosis of faults.
5.5.2
Equipment Required
It is beyond the scope of this manual to list every piece of equipment that
an installation technician should carry. However, the following tools are
specifically required for installing the base station:
an installation technician should carry. However, the following tools are
specifically required for installing the base station:
■
Pozidriv PZ3 screwdriver for the M6 screws used in the DC input
terminals on the PMU; M6 (0.25in) screws are also used to secure the
subrack to the cabinet in factory-assembled systems
terminals on the PMU; M6 (0.25in) screws are also used to secure the
subrack to the cabinet in factory-assembled systems
■
Pozidriv PZ2 screwdriver for the M4 screws used to secure the module
retaining clamps, and for the fasteners used to secure the front panel to
the subrack
retaining clamps, and for the fasteners used to secure the front panel to
the subrack
■
8mm AF spanner for the SMA connectors, and the subrack ground
connector.
connector.
You can also obtain the TBA0ST2 tool kit from your regional Tait office.
It contains the basic tools needed to install, tune, and service the base
station.
It contains the basic tools needed to install, tune, and service the base
station.
Transmit and Receive
Receive Only
Band
System
External
Reference
1PPS
External
Reference
1PPS
B band
H band
H band
Non-simulcast
✘
✘
✘
✘
Simulcast
✔
✔
✘
✘
K band
Non-simulcast
✔
✘
✔
✘
Simulcast
✔
✔
✔
✘