Справочник Пользователя для Checkpoint Systems Inc. EVOLVEF10

Скачать
Страница из 71
F10 Installation Manual 
                         Rev. *60          
 
24 of 71
 
Finishing Installation 
Wiring the electronics, and configuring and tuning the antennas must occur before finishing the 
physical installation. Proceed to Chapters 4, 5 and 6, complete the setup and validation, and then 
return to this section when ready to finish the physical installation.  
Filling Trenches  
The floor cuts or cavities are filled with concrete mortar, grout, and/or sealants during this final 
step, ensuring the antenna locations are not visible. It is crucial that the grout be non-metallic and 
non-magnetic. Occasionally (F10 system below wooden flooring), the antenna system is not 
covered by Checkpoint personnel, as it will later be covered with flooring. Protect, as necessary. 
The F10 system has been tested and is approved to be used with the following concrete repair 
mortars and mixes: 
1.  Ardex TRM – Transportation Repair Mortar 
 
2. 
QUIKRETE® Concrete Mix (No. 1101) 
  
 
 
3. 
QUIKRETE® Fast-Setting Concrete Mix (No. 1004)
 
 
 
  Note: 
  
Detection performance of the system may be temporarily affected by the water content in the repair 
mortar.  As the mortar mix cures, detection performance improves.