SP-5 site preparation punch list sheet
The following punch list is used to track any outstanding site preparation items.
Item #
Comment/Description
Severity
(1/2/3)
Corrective action required
(Y/N)
Completed date
Severity level definitions:
The following lists the severity level definitions.
1. Equipment installation cannot occur until outage is rectified and will void warranty or
potentially cause personal injury.
2. Equipment installation can occur but issue must be rectified prior to handoff to
customer or service turn-up so that the warranty is not voided.
3. Equipment installation, handoff to customer, or service turn-up can occur but not per
Alcatel-Lucent recommendations.
Inspection checklist completion sign-off (complete below)
Was the punch list continuation sheet on the next page used? Yes or No
Inspector's Name:
Inspector's Signature:
Date:
Site preparation checklists
SP-5 site preparation punch list sheet
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
A-10
Alcatel-Lucent – Proprietary
Use pursuant to applicable agreements
B25 RRH4x30
3MN-02023-0001-RJZZA
Issue 0.02
January 2015
D
R
AFT
D
R
AFT