Справочник Пользователя для IDEAL INDUSTRIES ESCGRID1001

Скачать
Страница из 9
Product Manual 
ESCGRID1001 – LVDC Grid Luminaire Controller  
 
ND xxxx-x  04/2017 Users Manual – ESCGRID1001 LVDC Grid Luminaire Controller 
Page 3 
 
www.idealindustries.com 
1. Strip the wires to 3/8”. 
2. Grip the LOAD +24V wire and firmly push conductor into the port marked with the black 
stripe.  See Fig. 2. 
3. Grip the LOAD -24V wire and firmly push conductor into the unmarked port.  See Fig. 2. 
4. After LOAD wire installation, the load can safely be disconnected and re-connected without 
re-installing the wires.  To disconnect the load, firmly grip the LOAD connector and pull to 
separate it from the main body of the Smart Connector.  To re-connect, simply push the 
LOAD connector into the corresponding port on the Smart Connector. 
 
DIM Connector  
The DIM Connector accepts 18 AWG copper conductors, solid or stranded (16 strands or less).  
Use only one conductor per port and ensure that no copper is exposed on any of the wires after 
installation. 
 
1. Strip wires to 3/8”.  
2. Grip positive/(+)/purple DIM conductor and firmly push into the port marked “1”. See Fig. 3.  
3. Grip negative/(-)/gray DIM conductor and firmly push into the port marked “2”. See Fig. 3.  
4. After DIM wire installation, the DIM connector can safely be disconnected and re-connected without 
re-installing the wires. To disconnect the DIM connector, firmly grip the DIM connector and pull to 
separate it from the main body of the Smart Connector. To re-connect, simply push the DIM 
connector into the corresponding port on the Smart Connector. 
 
 
PROGRAMMING  
Refer to the Audacy™ system configuration manual to associate smart connectors to other 
devices and to set up operating parameters for the Audacy™ lighting control system