Справочник Пользователя для Unique Broadband Systems Ltd. DRU1KW
Chapter
3
Installation
3
Installation
3.1
Introduction
This section describes the installation procedures for the DRU-1k, which is to be installed in
a restricted access location.
3.2
Components/Sub-Assemblies Installed at the Factory
The following components/sub-assemblies are installed in the Combined DRU cabinets prior
to shipping.
Table 3-1 Combined DRU Components/Sub-Assemblies Installed at the Factory
Electronics Compartment
Part Number
Quantity
HB PDU
SX03-21300-01
1 (HB Cabinet)
LB PDU
SX03-22300-01
1 (LB Cabinet)
Dual Band Pass Filter (DBPF)
SX03-50100-01
1 (HB Cabinet)
Low Noise Amplifier (LNA)
SX03-50200-01
1 (HB Cabinet)
BMS Mounting Shelf w/Controller
SX03-50300-01
1 (HB Cabinet)
BMS 12 VDC Battery
SX03-50330-01
1 (HB Cabinet)
Air-to-Air Heat Exchanger/Heater
SX03-50400-01
2 (1 per cabinet)
Transmission Sub-system Controller (TSC)
SX03-50700-01
2 (1 per cabinet)
LBD DR Filter
SX03-51100-01
1 (LB cabinet)
Break Out Board
SX03-92020-01
2 (1 per cabinet)
TRMS N/A
1
(LB
Cabinet)
HPA Compartment
Part Number
Quantity
4-Way Splitter
000087234R
2 (1 per cabinet)
4-Way Hybrid Combiner w/Loads
SX03-21825-01
2 (1 per cabinet)
Fan (Blower) Box
SX03-50500-01
4 (2 per cabinet)
WG WR340 Coupler/RF Detector
SX03-51600-01
2 (1 per cabinet)
HPA PSU Mounting Shelf
SX03-51710-01
4 (2 per cabinet)
Output Filter Network (OFN) Cabinet
Part Number
Quantity
Combined OFN, WG
SX03-24100-02
1
WG WR340 Coupler/RF Detector
SX03-51600-01
1
SX03-20000-01-M01 3-1