5.5. Net socket certification 
To ensure the proper installation of the wiring, the new net sockets must be certified. The 
record of the certification of each of the sockets will be saved. 
6. Beacons placement 
Once the wiring is complete and the numbers of the sockets are noted down in the plan, 
the  beacons  are to  be  installed  in  the  corresponding  beacon  socket  (red  round  symbol). 
The process of placement is described below. 
6.1. Wall/ceiling support installation 
It is necessary to fix the support/holder of the beacon beforehand to the wall or ceiling in 
order to get it placed in its corresponding position. The instructions are detailed in Annex I: 
Beacon attachment.
 
6.2. Placement of the beacon in its support 
Once  the  support  is  fixed,  the  beacon  can  be  placed  in  it.  The  following  steps  must  be 
followed: 
1-  Note down in the paper plan the serial number of the beacon 
2-  Connect the beacon to the Ethernet socket 
3-  Place the beacon in its support. 
The serial number is specified in the label attached to the bottom of the beacon. Figure 2 
shows the serial number circled in red. 
 
 
 
Figure 2 
– Beacon serial number 
6.3. Other beacon placements