Справочник Пользователя для SmartStuff Inc. SSI-CTRLR

Скачать
Страница из 28
24000-01 
Rev 01 
 
Page 12
 
 
 
UNPACKING AND PARTS LIST
 
4.1  Unpacking
 
The Virtual Zone Climate Control System will typically be packaged in one 
shipping container.  One box will contain all components, and installation 
hardware. 
Note:  The original packing materials should be saved whenever possible in the 
event that the system is removed or relocated. 
 
CAUTION 
Use care in unpacking and transporting system.  Improper 
handling may result in damage to system components. 
 
4.2  Inventory of Parts 
Table 1 lists the parts contained in the shipping containers. 
Description 
VirtualZone® Zone Temperature Control System
 
     SmartController™
 
     SmartSensor™
 
     SmartDamper™
 
     Installation Hardware
 
System Installation & Startup Manual  
Table 1 
VirtualZone® Parts List