Справочник Пользователя для SmartStuff Inc. SSI-CTRLR
24000-01
Rev 01
Page 12
4
UNPACKING AND PARTS LIST
4.1 Unpacking
The Virtual Zone Climate Control System will typically be packaged in one
shipping container. One box will contain all components, and installation
hardware.
shipping container. One box will contain all components, and installation
hardware.
Note: The original packing materials should be saved whenever possible in the
event that the system is removed or relocated.
event that the system is removed or relocated.
CAUTION
Use care in unpacking and transporting system. Improper
handling may result in damage to system components.
handling may result in damage to system components.
4.2 Inventory of Parts
Table 1 lists the parts contained in the shipping containers.
Description
VirtualZone® Zone Temperature Control System
SmartController™
SmartSensor™
SmartDamper™
Installation Hardware
System Installation & Startup Manual
Table 1
VirtualZone® Parts List