Справочник Пользователя для Appareo Systems LLC 1535103
Installation Manual
Rev: 1.2
Last Revised: 3/22/16
Document Number: 600840-000038
Page 6 of 9
3.2. INSTALLATION INSTRUCTIONS OVERVIEW
System installation is accomplished in the following steps:
1) Installation of Gateway into the tractor cab headliner
a. Torque the antenna terminations to Gateway RF SMA connectors with a torque
spec of 7-10 in-lbs +/- 0.5 in-lbs. Mount the
Gateway enclosure to the cab with ¼”
or 6-mm fasteners and a torque of 30 in-lbs.
2) Installation of Antennas
a. Find a location on the equipment such that the following distances are the
minimum spacing between system components.
Table 1 System Component Minimum Spacing
Operator
Gateway
Antenna Hub 1
(Recommended minimum
spacing between antenna
hubs is 7.5 cm)
spacing between antenna
hubs is 7.5 cm)
40 cm (USA)
60 cm (Canada)
20 cm
Antenna Hub 2
40 cm (USA)
60 cm (Canada)
20 cm
Gateway
20 cm
N/A
b. Ensure the antennas have a ground place of 300 x 300 mm around them.
c. Torque the antenna mounting nut (M14x1) to 30 +/- 0.5 in-lbs.
c. Torque the antenna mounting nut (M14x1) to 30 +/- 0.5 in-lbs.
3.3. PARTS LIST FOR INSTALLATION
The following parts are required for the installation of Gateway.
Table 2 Parts List for Installation
Parts List for Installation
Item
Nomenclature
Part Number
QTY
1
Gateway
153510-000003
1
2
Antenna Hub 1
NA
1
3
Antenna Hub 2
NA
1