Справочник Пользователя для IBM Flex System V7000 Expansion Enclosure 4939H29

Модели
4939H29
Скачать
Страница из 610
Chapter 2. Introduction to IBM Flex System V7000 Storage Node 
51
Draft Document for Review January 29, 2013 12:52 pm
8068ch02-HW Intro.fm
2.4.2  Expansion canister
The expansion canister connects the expansion disks to the control canister using the SAS2 
6 Gbps chain interface. This module also enables the daisy-chaining of additional expansions 
to be connected behind it to further expand the capacity of the system’s storage. The 
expansion canister is also a Customer Replaceable Unit (CRU). Figure 2-6 on page 52 is a 
picture of the expansion canister with its cover removed.
Controller Indicators
Power
��
Slow Blink - Power 
available but Processor 
shutdown.
��
Fast blink - doing POST.
��
On solid - Powered up. 
Status
��
Off - not operational
��
Solid - in a cluster
��
Slow blinking - in cluster or 
service state
��
Fast blink - is upgrading
Activity
The Activity LED blinks to show 
there is IO activity 
Controller FRU
Control canister hardware fault
Control Hardware 
problem with the 
control canister.
Internal FRU
Problem with an internal FRU 
like the network adapters.
Battery Indicators
In Use
Fast blink- System is shutting 
down on battery power.
Status
��
Slow blink - Charging, but 
has enough power to boot 
the canister.
��
Fast blink - Charging, and 
does not have enough 
power to boot the canister 
(Error 656)
��
On solid - Fully charged.
Fault 
On - Hardware fault detected
LED Group
LED Name
Meaning