Condensate Drain Requirements
Pitch condensate drain line down to floor drain at 
minimum of ¼” per foot (21mm/m). External condensate 
pump (not furnished)  may be used if floor drain is not 
available. Condensate pump must be designed for flue gas 
condensate application.
 Condensate trap is proved with boiler.
1. 
Build condensate trap in the field. See Figure 7.
2. 
Wood frame or blocks may be used to raise boiler 
to maintain drain pitch or to be above external 
condensate pump reservoir.
3. 
115 volt AC receptacle provided on service switch 
junction box which is located at boiler right side, 
to provide power for external condensate pump (if 
needed).     
Condensate Drain Piping
• Condensate trap is to be field installed as shown in 
Figure 7
.
• Provided are ½” PVC fittings for condensate drain trap 
(assembled in field). 
• The ½” diameter schedule 40 PVC condensate drain 
piping and pipe fittings must conform to ANSI standards 
and ASTM D1785 or D2846. 
• Schedule 40 PVC cement and primer must conform 
to ASTM D2564 or F493. In Canada, use CSA or ULC 
certified schedule 40 PVC drain pipe and cement.
• Condensate pump with reservoir (not furnished) may 
be used to remove condensate to drain line (sanitary 
line) above boiler if floor drain is not available or is 
inaccessible
Filling Condensate Trap With Water
Manually fill condensate trap  at initial start up with water 
Following steps are required to fill condensate trap for 
start up. Steps are only required at initial start up or if 
maintenance requires draining of condensate trap:
1. 
Pour about 1 cup of cold tap water into condensate trap 
vent.
2. 
Excess water will go through condensate drain line. 
Verify proper operation of drain line (and external 
condensate pump if used).
Chilled Water Piping
Install boiler used in connection with refrigeration system, 
so chiller medium is piped in parallel with boiler with 
appropriate valves to prevent chilled medium from entering 
boiler.
Boiler piping system of hot water boiler connected to 
heating coils located in air handling units where they may 
be exposed to refrigerated air circulation must be equipped 
with flow control valves or other automatic means to 
prevent gravity circulation of boiler water during cooling 
cycle.
4 - NEAR BOILER PIPING
Figure 8  - Condensate Trap and Vent
To Exhaust Vent
(2” CPVC)
½” Adapter
Male NPT x Socket
Weld PVC Piping
1 3/8” Long
To Boiler Flue Outlet (2” CPVC)
2” Male x 2” NPT Male PVC Bushing
1/2” PVC Elbow
1/2” PVC Piping 3 3/4” Long
1/2” PVC Elbow
1/2” PVC Piping 2” Long
1/2” PVC Piping 3 3/4” Long
1/2” PVC Tee
To Condensate Drain (Field Supplied)
2” NPT Male PVC Bushing
1/2” PVC Piping 12” Long