Инструкции По Установке для Utica Boilers UB90-200

Скачать
Страница из 50
16
6 - COMBUSTION AIR/ VENT REQUIREMENTS
Figure 12 - Concentric Vent
3” Diameter PVC
Vent/Exhaust
1½”
4½” Dia.
31⅞”
A
A
B
B
C
C
D
E
F
G
G
3” Diameter PVC
Intake/Combustion Air
46¾”
Dimension
1³⁄16”
D
E
F
Dimension
Figure 13 - Concentric Vent Roof Installation
• Combustion air must be clean outdoor air. Do not take 
combustion air from inside structure because that air 
is frequently contaminated by halogens, which includes 
fluorides, chlorides, phosphates, bromides and iodides. 
These elements are found in aerosols, detergents, 
bleaches, cleaning solvents, salts, air fresheners, paints, 
adhesives, and other household products. Typical areas 
of contamination include dry cleaning facilities, swimming 
pools, beauty shops, new building construction, air 
conditioning equipment. For example combustion air 
intake near swimming pool chemicals will damage any 
condensing boiler.
• Locate combustion air inlet as far away as possible from 
swimming pool and swimming pool pump house.
•  All combustion air and vent pipes must be airtight and 
watertight. 
• Follow instructions in this manual for combustion air and 
vent piping termination.
• Use of concentric vent termination refer to Figures 10, 11 
and 12 for proper setup.
• Vent connections serving appliances vented by natural 
draft shall not be connected into any portion of mechanical 
draft systems operating under positive pressure.
• Fully support all vent piping. Use hangers at intervals to 
prevent pipe from sagging.
 WARNING
Fire, explosion, asphyxiation hazard.  Solvent 
cements are combustible.  Keep away from heat, 
sparks, or open flame. Use only in well ventilated 
areas. Avoid breathing in vapor or allowing contact 
with skin or eyes. Improper installation could result 
in death or serious injury.  Read this manual and 
understand all requirements before beginning 
installation.
!
  
A Roof Boot/Flashing 
(Field Supplied)
B Elbow (Field Supplied)
C Support (Field Supplied)
D
Maintain 12” (305mm), 
18” (457mm)  
Minimum Clearance 
Above Highest 
Anticipated Snow 
Level. 
Maximum of (610mm) 
Above Roof.
 WARNING
Fire, asphyxiation hazard.  Covering non-metallic 
vent pipe and fittings with thermal insulation shall 
be prohibited. Improper installation could result in 
death or serious injury.  
!
  
NOTICE
Properly support venting. Boiler is not designed to 
bear weight of venting system.