Periodic maintenance  61 
Periodic maintenance 
Periodic maintenance overview 
Perform periodic inspections on the components in this section to be sure that the HP POD 20c continues to 
perform within the designed parameters. 
 
Qualified personnel 
Qualified personnel are identified as personnel who are: 
 
Properly trained in the operation and maintenance of the HP POD 20c 
 
Customer-authorized to conduct maintenance activities 
Qualified personnel can be: 
 
HP personnel 
 
Agents for HP 
 
Site maintenance personnel 
 
Cooling system 
 
Component to be inspected 
Task 
Frequency 
Capable Party 
Air filters 
Inspect and replace as necessary  As needed (at 
least quarterly) 
Qualified personnel 
Air filter differential pressure 
sensor 
Inspect and replace as necessary  Annually 
Qualified personnel 
Cooling system leak check 
Verify that there is no visible 
chilled water leakage from the: 
 
Heat Exchanger 
 
CWS piping 
 
CWR piping 
If a leak is detected, see "Leak 
detection (on page 
)." 
Quarterly 
Qualified personnel 
Condensate drain pans 
Inspect and verify that the: 
 
Pans are free of debris 
 
Pans have no leaks 
 
Leakage detectors are in 
proper position 
Clean pans as necessary 
Quarterly 
Qualified personnel 
Condensate drain pan sensors 
Inspect, test, and replace as 
necessary. 
If a leak is detected, see "Leak 
detection (on page 
)." 
Quarterly 
Qualified personnel