Site pad 
The structural design of the HP POD 20c site pad must be based on the specific weight load of the complete 
POD solution with IT installed, as well as any additional equipment. During design calculations, HP 
recommends that you provide structural support along the entire perimeter of the POD and use the maximum 
allowable POD weight. 
Upon installation, the POD structure must be leveled to less than or equal to 0.5º. Shimming is allowed 
around the perimeter of the POD to ensure that the POD remains level. If significant shimming is required, 
shims should be spaced no less than 1.2 m (4 ft) apart to ensure sufficient load transfer. Shims are not 
included. 
  
 
IMPORTANT:
  The HP POD 20c is designed for ground level installation. If you install the HP POD 
20c on an elevated surface, verify that the minimum height requirements for circuit breaker 
actuators are considered per national, regional, and local regulations and electrical codes. The 
area in front of the outside panels must include a work platform. 
  
 
HP POD 20c weight 
  
 
IMPORTANT:
  The weight provided is a minimum and an absolute maximum rated weight. The 
total weight of the HP POD 20c differs based on the IT equipment and optional components 
purchased and installed. 
  
The overall weight might significantly vary depending on the final customer-chosen solution for the HP POD 
20c. Each site pad must meet the weight requirements of the equipment that is expected to be installed. 
The HP POD 20c must be installed on a surface capable of supporting the following weights: 
 
HP POD 20c with no IT equipment installed—Approximately 7,711 kg (17,000 lb) 
 
HP POD 20c with IT equipment installed—Maximum 22,680 kg (50,000 lb) 
 
Dimensions and clearances 
The selected site for the HP POD 20c must be large enough to install, service, maintain, and provide space 