Инструкции По Обслуживанию для HP Performance Optimized Data Center (POD) 40c
Periodic maintenance 67
Fire alarm and suppression system
Component to be inspected
Task
Frequency
Capable Party
Full system functional check
Inspect and perform a functional
check of the system.
As required by
local code
Licensed fire safety
contractor
—
Inspect and test fire panel
battery backup system.
battery backup system.
Bi-annually
Licensed fire safety
contractor
contractor
—
Inspect and test VESDA power
supply.
Quarterly
Licensed fire safety
contractor
—
Inspect the VESDA pipe
network.
network.
Bi-annually
Licensed fire safety
contractor
contractor
—
Inspect the VESDA filter.
Annually
Certified facilities
personnel
—
Conduct a VESDA pipe integrity
smoke test.
smoke test.
Annually
Licensed fire safety
contractor
contractor
—
Check the VESDA pipe flow.
Annually
Licensed fire safety
contractor
—
Clean the VESDA sampling
points.
points.
Every 2 years
Licensed fire safety
contractor
contractor
—
Flush the VESDA pipe network. Every 2 years
Licensed fire safety
contractor
—
VESDA system air
sampling/smoke test
As required by
local code
Licensed fire safety
contractor
—
Suppression system test
As required by
local code
Licensed fire safety
contractor
—
Fire-pull visual and operational
inspection
As required by
local code
Licensed fire safety
contractor
—
Fire strobe and horn visual and
operational inspection
As required by
local code
Licensed fire safety
contractor
Generator (if applicable)
Component to be inspected
Task
Frequency*
Capable Party
Generator
Visual inspection of the generator Quarterly
HP and certified
facilities personnel
facilities personnel
—
Oil change
Annually
HP
—
Oil filter change
Annually
HP
—
Oil analysis
Annually
HP
—
Fuel filter change
Annually
HP
—
Coolant freeze point and
inhibition check each time the
inhibition check each time the
generator is viewed
—
HP
*These are typical frequencies. See the documentation for the installed component for the recommended schedule.