Справочник Пользователя для Westinghouse SE 6000

Скачать
Страница из 180
5-10
S
ECTION
 5: M
ASTER
 F
ILE
 R
EPORTS
R
EADER
 P
ROJECT
 R
EPORT
The Reader Project Report lists project number, description, readers assigned, current status.
N
OTE
This report gives reader project status based on start / stop dates defined by the project entry
function compared to the current system date and time.  Since the selection criteria and reported
status do not consider operator overrides, actual and reported project status may differ.
A sample reader project report screen follows:
R
EADER
 P
ROJECT
 R
EPORT
 — S
AMPLE
 R
EPORT
TIME CODES
This report lists all time codes set up in the database.   A sample screen follows:
05/05/96
Security Electronics
Page   1
13:42
Project / Reader Report
Project
Project Description
Schedule
Reader
Reader Description
_______
____________________________________ ________
______
_____________________
10
TEST PROJECT #1
Active
8110
808SX DOOR 1
8120
808SX DOOR 2
15
EMERG. CIRCUIT BOARD REV. PROJECT
Active
1001
422 ENTRY #1
1010
818 #7 DOOR #1 ALPHA