Справочник Пользователя для Southbend SB1023

Скачать
Страница из 48
For Machines Mfg. Since 8/09
Model SB1023
-9-
P R E P A R A T I O N
PreParaTiOn
Preparation Overview
The purpose of the preparation section is to help 
you prepare your machine for operation.
The typical preparation process is as follows:
1.  Unpack the machine and inventory the 
contents of the box/crate.
2.  Clean the machine and its components.
3.  Identify an acceptable location for the 
machine and move it to that location.
4.  Level the machine and either bolt it to the 
floor or place it on mounts.
5.  Assemble the loose components and make 
any necessary adjustments or inspections to 
ensure the machine is ready for operation.
6.  Connect the machine to the power source.
7.  Test run the machine to make sure it 
functions properly and is ready for operation.
Things You'll need
During the setup process, operation, and 
maintenance of your machine, you'll need the 
following items:
For Lifting
•  A forklift or other power lifting device
rated for the weight of the machine.
•  Lifting Strap or Chain (rated for at least 
1500 lbs.)
For Power Connection
•  A machine power connection that meets
federal, state, and local electrical codes. 
An electrician may be required. 
For assembly
•  Assistant 
•  Cotton Rags 
•  Mineral Spirits 
•  Safety Glasses
•  Wrench 14mm 
•  Wrench 19mm 
•  Oil Can with any General Machine Oil