Справочник Пользователя для Vortech Engineering Nissan 350Z/Infinity G35Supercharger System 2003-2006

Скачать
Страница из 28
P/N: 4NZ020-010
©2007 Vortech Engineering, LLC
All Rights Reserved, Intl. Copr. Secured
12JAN07 v4.0 Nissan 350Z(4NZv4.0)
1
A.
Open doors (to retract windows) and discon-
nect the battery negative cable. Close doors.
B.
Remove the strut tower brace if equipped
(optional).
C.
Remove the plastic engine cover and set
aside.
D.
Remove the valve cover breather hose from
the factory air inlet duct. Remove the air filter
and all ducting up to the throttle body. Unplug
the MAF (mass air flow sensor) and remove it
from the air filter housing. Set it aside for later
use along with its O-ring.
E.
Remove the splash pan from the bottom of
the vehicle and set aside.
F.
Loosen the accessory drive belt tensioner
idler center nut. From underneath the vehicle,
turn the tensioner screw counter-clockwise
until it stops. Remove the accessory drive
belt.
G.
Remove and discard the two brackets secur-
ing the large wiring loom on the top of the
engine.
H.
Remove the bracket (if equipped) securing
the 5/8" I.D. coolant hose to the front of the
engine.
I.
Remove and set aside the driver’s side 12mm
screw for later use. (See Fig. 1-b.)
J.
Remove the two engine cover screws from
the positions shown. (See Fig. 1-a.)
K.
350Z: Remove the small engine air inlet duct
that protrudes through the radiator core sup-
port.
L.
From underneath the vehicle, remove and
discard the power steering cooler brackets
located in front of the radiator.
M.
350Z Convertibles only: Locate and remove
the chassis vibration damper and mount on
the driver’s side frame rail next to the sway
bar mount. This provides a path for Charge
Air Cooler ducting.
1.
PREPARATION/REMOVAL
Fig. 1-a
REMOVE FACTORY
SCREWS
Fig. 1-b
REMOVE AND
SET ASIDE