Инструкции По Установке для Utica Boilers UB90-100

Скачать
Страница из 72
5
DSI Removal Conti.
11.  Remove mixing valve body and fi rst gasket. See 
fi gure 9.
12.  Remove existing burner plate. 
13.  Disconnect all wires connected inside the junction 
box.
14.  Remove small conduit knockout from upper left of 
junction box. See fi gure 10.
15.  Mark hole from knockout on panel for location. 
See fi gure 10.
16.  Remove two screws holding junction box. Remove 
junction box. Save screws and junction box for 
use. 
17.  Drill out 1 inch hole in center of hole marked from 
knockout, deburr.  Predrill to avoid scratching 
sheet metal. See fi gure 12.
18.  Remove strain relief attached to junction box. 
Dispose of cut wires and strain relief. See fi gure 
11.
Figure 12 - Drill Hole For Junction Box
Figure 10 - Mark Knockout Hole on Sheet Metal
Figure 11 - Remove Wire Strain Relief
Figure 9 - Mixer with Gasket
Note: Additional hole 
is required for low 
voltage wires.