SSC Series Central Chilling Stations 
To Process 
The chilled water supply outlet leading to the process being 
controlled. 
 
From Process 
The chilled water return for water returning back to the chiller 
from the process to be cooled and recirculated. 
 
3-5  Making Tank Piping Connections 
If you have purchased the SSC Series central chilling station with 
the integral pump tank, please proceed with this section. 
 
Return 
Bring the chilled water returning from the process to the pump 
tank warm 
From Process
 side. This line is sized according to the 
flow rate from the process to the pump tank. See Section 3-3 on 
Page 21 for more information on piping considerations. 
 
Important! 
Do not use the SSC Series unit to support piping. 
 
Makeup 
Connect a city water source to maintain water level in the pump 
tank. 
 
Overflow 
Connect the 
OVERFLOW
 outlet to an approved, trapped drain to 
permit excess water in the pump tank to overflow to the drain. The 
overflow line is sized according to the size of the pump tank. 
 
To Drain 
Connect to a 1½” line (approx. 63 mm) leading to an approved, 
trapped drain. You can drain the pump tank if necessary.